Technical and General Specification of DFO Slope Drain Tank Integrity and Fitness for Service at L-I Station

UaeTenders notice for Technical and General Specification of DFO Slope Drain Tank Integrity and Fitness for Service at L-I Station. The reference ID of the tender is 51264354 and it is closing on 18 Mar 2021.

Tender Details

  • Country: UAE
  • Summary: Technical and General Specification of DFO Slope Drain Tank Integrity and Fitness for Service at L-I Station
  • AET Ref No: 51264354
  • Deadline: 18 Mar 2021
  • Financier: Self Financed
  • Purchaser Ownership: -
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: 2332100535
  • Purchaser's Detail:
  • Purchaser : DUBAI ELECTRICITY & WATER AUTHORITY (DEWA)
    P.O. Box: 564 Dubai Tel: +971-46019999 Fax: +971-46019995
    Email :customercare@dewa.gov.ae
    URL :http://www.dewa.gov.ae

  • Description:
  • Quotation are invited for Technical and General Specification of DFO Slope Drain Tank Integrity and Fitness for Service at L-I Station. TECHNICAL AND GENERAL SPECIFICATION OF DFO SLOPE DRAIN TANK INTEGRITY AND FITNESS FOR SERVICE AT L-I STATION, JEBEL ALI DFO SLOP DR AIN TANK INTERNAL INSPECTION AND NDT ANALYSIS SHALL BE CONDUCTED AS PER THE API 653. 1.1 DETAILS DFO SLOPE DRAIN TANK THE SPECIFIC ATION OF THE TANK AS FOLLOWS, TYPE OF TANK: #ABOVE GROUND TANK TANK SIZE: ##DIA 2 M, H 2.2 M, MAT-S 275 JR CAPACITY (GROSS): 5.8 M3 DESIGN TEMPERATURE : -100.0 C STORAGE MEDIUM- DIESEL FUEL OIL DESIGN PRESSURE: ATMOSPHERIC DESIGN CODE: API-650 SCOPE OF WORK: INTEGRITY ANALYSIS AND FITNESS FOR SERVICE ASSESSMENT OF DFO SLOP DRAIN; SCOPE OF WORK INCLUDE, BUT NOT LIMITED TO THE FOLLOWING. 1.#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETY MEASURES ETC., BEFORE SUBMITTING OF HIS BID. 2.#GET DAILY WORK PERMIT FROM THE DEWA CONCERNED AUTHORITY TO COMMENCE THE WORK . MOBILIZE THE LABOR, EQUIPMENT, SAFETY TOOLS, INTEGRITY TOOLS AND CONSUMABLES. 3.#THE METHOD OF STATEMENT AND RISK ASSESSMENT WILL BE DISCUSSED AND APPROVED FROM DEWA CONCERNED PERSONNEL. 4.#METHOD OF EXECUTION SHALL BE SUBMITTED PRIOR TO START OF THE WORK. 5.#CO NDUCT INTERNAL INSPECTION AND PERFORM NDT AS PER THE COMPLIANCE API 653. 6.#ON BASIS OF FINDINGS IN NDE, FITNESS FOR SERVICE ASSESSM ENT SHALL BE CARRIED OUT AND RECOMMENDATIONS FOR REPAIR (IF ANY) SHALL BE PROVIDED. 7.#INSPECTION AND ANALYSIS SHALL BE CARRIED OUT BY A PERSON HOLDING VALID API 653 INSPECTOR CERTIFICATION TO DO THE TASK. 8.#INSPECTION CERTIFICATE, TOOLS CALIBRATION CERTIFICATES SHOULD BE SUBMITTED PRIOR TO START OF THE WORK. 9.#DEWA CONFINED SPACE ENTRY PERMIT SHOULD BE RENEWED EVERY DAY AS IT IS VALID FOR O NE DAY ONLY. 10.#ALL MATERIALS, EQUIPMENT AND CONSUMABLES (EXPECT THE ITEMS MENTIONED IN DEWA SCOPE) REQUIRED FOR THE WORK SHALL BE ARRANGED BY THE CONTRACTOR. 11.#THE FINAL INSPECTION AND APPROVAL FROM DEWA PERSONAL 12.#DE MOBILIZATION AND SITE CLEARANCE. 13.#A F INAL REPORT WITH DETAILS OF INSPECTION CARRIED OUT, RESULT ANALYSIS, RECOMMENDATIONS, NEXT INSPECTION DATE AND FFS CERTIFICATE SHALL BE PROVIDED. DEWA SCOPE: 1.#SCAFFOLDING 2.#AIR, WATER AND ELECTRICITY. 3.#ALL REQUIRED GATE PASS FOR WORKING PERSONS AND COLLECTE D WASTES TO BE DISPOSED. 4.#MANHOLE OPENING AND CLOSING OF THE TANKS. 5.#DRAWING OF THE TANK (ATTACHED). 6.#REPAIR WORK IF ANY GENE RAL TERMS & CONDITIONS: 1.#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, M ATERIAL REQUIREMENT, FACILITIES, COMPLEXITIES, SAFETY MEASURES ETC., BEFORE HE SUBMIT HIS BID 2.#THE CONTRACTOR SHALL HAVE THE PREVI OUS EXPERIENCE FOR SAME TYPES OF WORK IN DEWA OR WITH WELL KNOWN COMPANY IN UAE. 3.#THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF WORK AND THE PERIOD FOR WORK SO THAT THE WORK SHALL COME WELL WITHIN THE ALLOTTED OUTAGE PERIOD. THE SCHEDULE SHALL BE APPROVED BY DEWA BEFORE COMMENCEMENT OF WORK 4.#THE CONTRACTOR SHALL ENSURE HOUSEKEEPING ON A DAILY BASIS AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WASTE MATERIAL DISPOSALS TO DESIGNATED PLACES AS PER DEWA ENVIRONMENTAL POLICY OF HAZARDOUS WASTE DISPOSAL. 5.#ALL DEWA SAFETY & ENVIRONMENT POLICY, RULES AND REGULATION SHALL BE FOLLOWED AT WORK SITE DURING THE EXECUTION OF THE WORK. THE CONTRACTOR#S ENGINEE R SHOULD BE FAMILIAR WITH SAFETY REGULATIONS WHILE WORKING IN A HAZARDOUS AREA. 6.#THE WORK SHALL BE EXECUTED UNDER DEWA SUPERVISION AND AS PER QUALITY / SCHEDULE REQUIREMENT. CONTRACTOR#S SUPERVISOR SHALL BE AVAILABLE AT SITE THROUGHOUT THE PERIOD OF WORK. 7.#THE CONTRACTOR SHOULD APPLY FOR THE PERMIT TO WORK WELL IN ADVANCE AND THIS REQUEST SHALL BE FOLLOWED WITH METHOD STATEMENT, RISK ASSES SMENT AS ATTACHMENTS 8.#ENTRY PERMITS FOR THE STAFF/WORKERS SHOULD BE APPLIED WITH PASSPORT COPIES HAVING VALID VISA. PERSONS, WHOS E NAMES ARE NOT AVAILABLE IN THE LIST, WILL NOT BE ALLOWED TO ENTER THE POWERHOUSE 9.#THE CONTRACTOR UPON RECEIVING THE WORK PERMIT SHALL FIRST ENSURE A SAFE WORKING CONDITION. 10.#ENTRY PERMITS FOR THE VEHICLE SHOULD BE APPLIED WITH COPIES OF VEHICLE REGISTRATION . 11.#ALL THE PERSONS SHOULD WEAR THE UNIFORM, SAFETY SHOES AND HELMET WHILE AT WORK. 12.#ALL MATERIAL AND TOOLS BROUGHT IN SHALL BE DECLARED AT POWER STATION SECURITY GATE AND THE LIST OF THESE ITEMS SHALL BE SIGNED BY DEWA SECURITY. THE COPIES OF THESE DOCUMENT S SHALL BE LODGED WITH DEWA ENGINEER IN-CHARGE ON DAILY BASIS. THIS DOCUMENT WILL BE THE BASIS FOR THE CLEARANCE (GATE PASS) TO TAK E THEM OUT ON COMPLETION OF THE JOB. 13.#TOOLBOX TALKS AND RISK ASSESSMENTS SHOULD BE GIVEN TO THE WORKMEN BY THEIR SUPERVISOR BEFOR E START OF WORK. 14.#DEWA ENGINEER-IN-CHARGE SHALL BE UPDATED THE WORK PROGRESS ON A REGULAR BASIS. 15.#CONTRACTOR SHOULD GET HOT WO RK PERMIT FROM DEWA ENGINEER-IN-CHARGE ON DAILY BASIS AND PROVIDE TBT AND RA ACCORDINGLY. 16.#CONTRACTOR SHALL COMPLY THE SA 8000 ST ANDARD AS PER DEWA TERMS AND CONDITIONS. 17.#SAFETY OFFICER BY THE CONTRACTOR IS REQUIRED AT SITE. 18.#SLEEPING IS NOT ALLOWED IN PL ANT PREMISES. DRAWING OF THE TANK ATTACHED BELOW Qty: 1 DFO SLOPE DRAIN TANK INTEGRITY AND FITNESS FOR SERVICE AT L-I STATION,JEBEL ALI , DEWASCOPE OF WORK WITH DRAWING ATTACHED. For more information contact Mr. Nadeem Anjum 04-81-40678 +971509124804 Nadeem.Ahmad@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be `DDP` delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.
  • Documents:

 Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
UaeTenders Features

UaeTenders Features

Fresh and verified Tenders from Uae. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM
Tender Experts

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Captcha Image
Invalid Captcha !

Get FREE SAMPLE TENDERS from Uae in your email inbox.

  Chat with us