• Contact Us
  • New Tenders
  • Register
  • Login

Diverter Damper Work

UaeTenders notice for Diverter Damper Work. The reference ID of the tender is 51526239 and it is closing on 28 Mar 2021.

Tender Details

  • Country: UAE
  • Summary: Diverter Damper Work
  • AET Ref No: 51526239
  • Deadline: 28 Mar 2021
  • Financier: Self Financed
  • Purchaser Ownership: -
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: 2332100705
  • Purchaser's Detail:
  • Purchaser : DUBAI ELECTRICITY & WATER AUTHORITY (DEWA)
    P.O. Box: 564 Dubai, Tel: +971-46019999, Fax: +971-46019995
    Email :customercare@dewa.gov.ae
    URL :http://www.dewa.gov.ae

  • Description:
  • Quotation are invited for Diverter Damper Work 1032100907rfx Description. TECHNICAL AND GENERAL SPECIFICATIONS, OUTSOURCING WORK L STATION PHASE I, JEBEL ALI NAME OF WORK: SCOPE OF WORK FOR HRSG73 DIVER TER DAMPER HPU OPEN/ CLOSE TIME SETTING WO 510682345 PERIOD OF WORK: 1 DAY DURING HRSG73 SHUT DOWN OF L1 STATION TENTATIVE DATE FRO M 25.03.2021 TO 15.04.2021 SCOPE OF WORK: 路#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOP E, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETY MEASURES ETC., BEFORE HE SUBMITS HIS BID. 路#TO GET A PTW, HWP CONTRACTOR HAS TO SU BMIT RISK ASSESSMENT FORMS AND METHOD STATEMENT PRIOR TO START THE WORK. 路#CHECK CONDITION SUITABLE TO CARRY OUT WORK. CONDUCT SITE SURVEY AND SAFETY INSPECTION TO ASSESS THE WORKING ENVIRONMENT. 路#A SAFETY MEETING WILL BE HELD TO EVALUATE THE RISK INVOLVED IN MET HODS TO BE USED. RISK ASSESSMENT AND TOOL BOX TALK TO BE GIVEN TO THE EMPLOYEES. 路#MOBILIZE THE TEAM, EQUIPMENT, TOOLS, ETC. IMMEDIA TELY AFTER GETTING THE PO OR MAIL CONFIRMATION FROM DEWA TENTATIVE DATE FROM 25.03.2021 TO 15.04.2021 路#DD HPU OPENING AND CLOSING T IME SHALL BE ADJUSTED AS NORMAL OPENING / CLOSING 60 SECOND AND FAST CLOSING 20 SECOND. 路#CHECK, TROUBLE SHOOT, PREPARE THE PROCEDUR E AND HAND OVER / DISCUSS WITH DEWA REPRESENTATIVE. 路#DO THE ADJUSTMENT AS PER AGREED PROCEDURE. 路#MAKE THE VIDEO, PHOTOS DURING THE TIME ADJUSTMENT AND SUBMIT. 路#ADJUST THE NORMAL OPENING AND CLOSING TIME 60SECONDS AND FAST CLOSING 20 SECONDS. 路#DO THE ADJUSTMENT WHILE OPENING AND CLOSING AS PER ABOVE GIVEN TIME DURING COLD COMMISSIONING. 路#OPENING AND CLOSING SHALL BE CHECKED FROM CCR AND FR OM LOCAL ALSO AND IT SHALL BE SET AS PER GIVEN TIME ABOVE. 路#SUBMIT THE COMPLETE REPORT TO DEWA INCLUDING THE PHOTOS, VIDEOS AND PRO CEDURE CLEARLY. 路#AFTER COMPLETION OF ABOVE SCOPE OF WORK, JOINT INSPECTION WITH DEWA ENGINEER. 路#HOUSEKEEPING AND DISPOSAL OF WASTE IF ANY 路#INSPECTION AND APPROVAL FROM DEWA PERSONNEL. 路#DE-MOBILIZATION AND SITE CLEARANCE 路#PREVIOUS EXPERIENCE PO # TO BE PROVIDE D FOR THE SAME TYPE OF JOB FROM DEWA OR ANY OTHER WELL-KNOWN COMPANY. 路#WORK COMPLETION REPORT WITH TEST CERTIFICATES TO BE SUBMITTE D TO DEWA. 路#WARRANTY 12 MONTHS FOR WELD JOINTS WHICH TO BE DONE BY CONTRACTOR. DEWA SCOPE 路#HPU DRAWING 路#ANY SPARE REQUIRE 路#SCA FFOLDING IF REQUIRE. CONTRACTOR SCOPE OF MATERIAL SUPPLY TOOLS AND TACKLES MANPOWER GENERAL TERMS & CONDITIONS 1.#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETY MEASURES E TC., BEFORE HE SUBMIT HIS BID 2.#THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF WORK AND THE PERIOD FOR WORK SO THAT THE WORK SHALL COM E WELL WITHIN THE ALLOTTED OUTAGE PERIOD. THE SCHEDULE SHALL BE APPROVED BY DEWA BEFORE COMMENCEMENT OF WORK 3.#THE CONTRACTOR SHALL ENSURE HOUSEKEEPING ON A DAILY BASIS AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WASTE MATERIAL DISPOSALS TO DESIGNATED PLACES AS PER DEWA ENVIRONMENTAL POLICY OF HAZARDOUS WASTE DISPOSAL. 4.#ALL DEWA SAFETY & ENVIRONMENT POLICY, RULES AND REGULATION SHALL BE FOLLOWED AT WORK SITE DURING THE EXECUTION OF THE WORK. THE CONTRACTOR#S ENGINEER SHOULD BE FAMILIAR WITH SAFETY REGULATIONS WHILE WORKING IN A HAZARDOUS AREA. 5.#THE WORK SHALL BE EXECUTED UNDER DEWA SUPERVISION AND AS PER QUALITY / SCHEDULE REQUIREMENT. CONTRA CTOR#S SUPERVISOR SHALL BE AVAILABLE AT SITE THROUGHOUT THE PERIOD OF WORK. 6.#THE CONTRACTOR SHOULD APPLY FOR THE PERMIT TO WORK WE LL IN ADVANCE AND THIS REQUEST SHALL BE FOLLOWED WITH METHOD STATEMENT, RISK ASSESSMENT AS ATTACHMENTS 7.#ENTRY PERMITS FOR THE STAF F/WORKERS SHOULD BE APPLIED WITH PASSPORT COPIES HAVING VALID VISA. PERSONS, WHOSE NAMES ARE NOT AVAILABLE IN THE LIST, WILL NOT BE ALLOWED TO ENTER THE POWERHOUSE 8.#THE CONTRACTOR UPON RECEIVING THE WORK PERMIT SHALL FIRST ENSURE A SAFE WORKING CONDITION. 9.#ENTRY PERMITS FOR THE VEHICLE SHOULD BE APPLIED WITH COPIES OF VEHICLE REGISTRATION. 10.#ALL THE PERSONS SHOULD WEAR THE UNIFORM, SAFE TY SHOES AND HELMET WHILE AT WORK. 11.#ALL MATERIAL AND TOOLS BROUGHT IN SHALL BE DECLARED AT POWER STATION SECURITY GATE AND THE LI ST OF THESE ITEMS SHALL BE SIGNED BY DEWA SECURITY. THE COPIES OF THESE DOCUMENTS SHALL BE LODGED WITH DEWA ENGINEER IN-CHARGE ON D AILY BASIS. THIS DOCUMENT WILL BE THE BASIS FOR THE CLEARANCE (GATE PASS) TO TAKE THEM OUT ON COMPLETION OF THE JOB. 12.#TOOLBOX TA LKS AND RISK ASSESSMENTS SHOULD BE GIVEN TO THE WORKMEN BY THEIR SUPERVISOR BEFORE START OF WORK. 13.#DEWA ENGINEER-IN-CHARGE SHALL BE UPDATED THE WORK PROGRESS ON A REGULAR BASIS. 14.#CONTRACTOR SHOULD GET HOT WORK PERMIT FROM DEWA ENGINEER-IN-CHARGE ON DAILY BAS IS AND PROVIDE TBT AND RA ACCORDINGLY. 15.#PARTY SHOULD COMPLY THE SA 8000 STANDARD AS PER DEWA TERMS AND CONDITIONS. STANDARD TERMS & CONDITIONS 1) Prices should be `DDP` delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.
  • Documents:

 Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
UaeTenders Features

UaeTenders Features

Fresh and verified Tenders from Uae. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM
Tender Experts

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Captcha Image
Invalid Captcha !

Get FREE SAMPLE TENDERS from Uae in your email inbox.

  Chat with us